The Space Feed | Latest Space News
  • Home
  • News
    • Launches
    • Space Technology
    • Human Spaceflight
    • Space Exploration
    • Astronomy
  • Launch Schedule
    • Upcoming Launches
    • Completed Launches
  • Knowledge Base
    • All Missions
    • All Rockets
No Result
View All Result
  • Home
  • News
    • Launches
    • Space Technology
    • Human Spaceflight
    • Space Exploration
    • Astronomy
  • Launch Schedule
    • Upcoming Launches
    • Completed Launches
  • Knowledge Base
    • All Missions
    • All Rockets
No Result
View All Result
The Space Feed | Latest Space News

Artemis II SLS Receives Safety, Comms, and Booster Upgrades for Crewed Lunar Flyby

September 18, 2025
in Human Spaceflight

NASA has detailed a suite of performance, safety, and communications upgrades to the Space Launch System (SLS) for Artemis II, the first crewed mission of the Artemis campaign. Building on extensive flight data from the uncrewed Artemis I test, the enhanced Moon rocket is being readied for a roughly 10-day crewed lunar flyby that will validate systems ahead of later missions targeting lunar surface operations and supporting future human missions to Mars. The agency’s overview of improvements is available via NASA.

What changed for Artemis II

While the core SLS architecture remains the same — a core stage with four RS-25 engines, two five-segment solid rocket boosters, the interim cryogenic propulsion stage (ICPS), and adapters linking to Orion — the vehicle incorporates targeted refinements derived from analysis, testing, and Artemis I lessons learned:

  • Guidance and proximity ops: The ICPS now carries optical targets to support Orion crew training for manual piloting and practice maneuvers that inform future docking operations.
  • Navigation and communications: Upgraded navigation and repositioned antennas aim to maintain continuous links with NASA ground assets and the U.S. Space Force’s Space Launch Delta 45 along the Eastern Range.
  • Emergency detection and range safety: An ICPS-based emergency detection capability improves onboard awareness and alerting. The flight safety system incorporates a time delay to ensure Orion’s launch abort system has time to pull the crew capsule clear during a rare in-flight abort scenario.
  • Booster separation and timing: Solid rocket booster separation motors are canted an additional 15 degrees to widen clearance. SLS will also jettison boosters about four seconds earlier than on Artemis I, gathering flight data that, if validated, could yield roughly 1,600 pounds of additional payload capacity to Earth orbit on future missions.
  • Aerodynamic vibration mitigation: To counter unsteady airflow observed near booster attach points on Artemis I, engineers added paired six-foot-long strakes at the forward connections on the intertank and requalified avionics to withstand higher vibration environments.
  • Power distribution: The core stage power distribution control unit in the intertank has been updated to enhance protection and control of downstream electronics.

Why it matters

Artemis II is designed to demonstrate SLS and Orion performance with astronauts onboard, evaluate life-support and mission operations, and rehearse proximity operations that underpin later lunar rendezvous and docking. The communications and emergency systems upgrades target crew safety and continuous situational awareness, while aerodynamic and separation refinements aim to reduce structural loads and improve margin. Data from early booster separation will help calibrate models that could unlock incremental performance gains for cargo and crewed variants.

Program outlook

The mission plan calls for four astronauts to complete a lunar free-return trajectory and return to Earth, advancing certification for subsequent Artemis flights that will deliver crews and hardware to the Moon’s vicinity and surface. Integration, verification, and range certification activities continue at Kennedy ahead of final readiness reviews. For NASA’s full briefing on the Artemis II SLS configuration and integration progress, see the official update on nasa.gov.

Previous Post

NASA Exoplanet Count Reaches 6,000 as Roman and HWO Drive Next Discovery Phase

Next Post

Cygnus XL Cleared for ISS Capture After Software-Triggered Burn Cutoffs; Arrival Sept. 18

Related Posts

Human Spaceflight

ESA FLY study finds ISS missions feasible with prostheses, moves to certification and training

November 11, 2025
Human Spaceflight

ESA study clears path for prosthesis-wearing astronauts as McFall details certification and training plans

November 11, 2025
Human Spaceflight

New Shepard NS-32 Carries Six on Blue Origin’s 12th Crewed Suborbital Mission, Total Reaches 64 Flown

November 9, 2025
Human Spaceflight

New Shepard NS-32 completes 12th crewed mission as Blue Origin total reaches 64 people flown

November 6, 2025
Human Spaceflight

Blue Origin Flies Six on NS-33, Achieving 13th Crewed New Shepard Mission

November 6, 2025
Human Spaceflight

JAXA outlines fresh food manifest on HTV-X1 resupply mission

October 31, 2025
Next Post

Cygnus XL Cleared for ISS Capture After Software-Triggered Burn Cutoffs; Arrival Sept. 18

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Trending
  • Comments
  • Latest

NASA and SpaceX Conduct Crew-11 Dry Run Ahead of Launch

July 29, 2025

SpaceX Dragon Missions: Crew Prepares for Departure and Arrival at ISS

July 30, 2025

NASA Advances Supersonic Parachute Technology for Mars Missions

July 30, 2025

Upcoming Suborbital Rocket Launches from NASA Wallops: July 28-August 8, 2025

July 28, 2025

Dragonfly Mission Hits Major Test Milestones, Targets 2028 Falcon Heavy Launch

1

ESA Initiates Construction of LISA Mission to Detect Gravitational Waves

0

UK-France MicroCarb Satellite Launches to Enhance Global CO₂ Monitoring

0

NASA’s SpaceX Crew-11 Arrives at Kennedy Space Center for Upcoming Launch

0

ESCAPADE Reset to Nov. 13 After G4 Storm; Blue Origin VADR Launch Preserves Mars Trajectory

November 13, 2025

Brazil, INPE and ESA plan uptake of Biomass P-band radar data for Amazon carbon monitoring

November 13, 2025

LOFAR and XMM-Newton confirm coronal mass ejection from a red dwarf, threatening exoplanet atmospheres

November 12, 2025

DLR’s MAPHEUS-16 Sets Microgravity Payload Record with Twin Red Kite Motors

November 12, 2025

Popular Stories

  • NASA and SpaceX Conduct Crew-11 Dry Run Ahead of Launch

    0 shares
    Share 0 Tweet 0
  • SpaceX Dragon Missions: Crew Prepares for Departure and Arrival at ISS

    0 shares
    Share 0 Tweet 0
  • NASA Advances Supersonic Parachute Technology for Mars Missions

    0 shares
    Share 0 Tweet 0
  • Upcoming Suborbital Rocket Launches from NASA Wallops: July 28-August 8, 2025

    0 shares
    Share 0 Tweet 0
  • SpaceX Crew-11 Prepares for Launch: Final Steps Before Hatch Closure

    0 shares
    Share 0 Tweet 0
  • About
  • Advertise
  • Privacy & Policy
  • Contact
The Space Feed

© 2025 Stride Interactive Group

No Result
View All Result
  • Home
  • News
    • Launches
    • Space Technology
    • Human Spaceflight
    • Space Exploration
    • Astronomy
  • Launch Schedule
    • Upcoming Launches
    • Completed Launches

© 2025 Stride Interactive Group