The Space Feed | Latest Space News
  • Home
  • Launches
  • Space Technology
  • Human Spaceflight
  • Space Exploration
  • Astronomy
No Result
View All Result
  • Home
  • Launches
  • Space Technology
  • Human Spaceflight
  • Space Exploration
  • Astronomy
No Result
View All Result
The Space Feed | Latest Space News

NASA Advances Artemis III Moon Rocket Assembly at Kennedy Space Center

August 18, 2025
in Human Spaceflight

NASA has started the assembly of the Space Launch System (SLS) rocket for the Artemis III mission at the Kennedy Space Center. This mission aims to return humans to the Moon, with the planned launch set for 2025. Artemis III will mark the first crewed lunar landing since Apollo 17, enhancing the exploration efforts on the Moon and paving the way for future human missions to **Mars**.

The SLS core stage and other components are currently under processing to ensure that the rocket is ready for the upcoming mission. The teams are diligently working on the integration and testing phases, focusing on each component’s performance and reliability. The hardware being assembled includes the interim cryogenic propulsion stage, which plays a vital role in boosting the Orion spacecraft along its trajectory.

NASA’s Artemis program aims not only to bring humans back to the lunar surface but also to establish sustainable exploration by the end of this decade. Artemis III will return humans to new areas of the Moon, giving scientists new opportunities for discovery and preparing NASA for the next giant leap—sending astronauts to Mars.

This initiative emphasizes international and commercial partnerships, highlighting the significant role of private companies in supporting NASA’s ambitious exploration goals. As this preparatory work continues, it underpins the commitment to pushing the boundaries of what is possible in space exploration, thereby inspiring a new generation of explorers.

For more details on this development, visit the official NASA blog on the NASA website.

Previous Post

Curiosity Mars Rover Investigates Hollow Bedrock on Sols 4629-4630

Next Post

Artemis II Crew Simulates Night Launch Procedures at Kennedy Space Center

Related Posts

Human Spaceflight

Inside Orion: Artemis II Systems, Integration, and Mission Readiness

August 22, 2025
Human Spaceflight

Orion Stage Adapter Arrives at Kennedy for Artemis II Stacking and CubeSat Integration

August 21, 2025
Human Spaceflight

Orion Stage Adapter Arrives at KSC for Artemis II Stacking and CubeSat Integration

August 21, 2025
Human Spaceflight

NASA Schedules September Reveal of 2025 Astronauts and Artemis II Briefings, Eyes April 2026 Launch

August 20, 2025
Human Spaceflight

ISS Crew Engages in Health Monitoring and Exercise Science for Space Adaptation

August 19, 2025
Human Spaceflight

Final Artemis II Rocket Component Departs for Kennedy Space Center

August 19, 2025
Next Post

Artemis II Crew Simulates Night Launch Procedures at Kennedy Space Center

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Trending
  • Comments
  • Latest

NASA and SpaceX Conduct Crew-11 Dry Run Ahead of Launch

July 29, 2025

SpaceX Dragon Missions: Crew Prepares for Departure and Arrival at ISS

July 30, 2025

NASA Advances Supersonic Parachute Technology for Mars Missions

July 30, 2025

SpaceX Crew-11 Prepares for Launch: Final Steps Before Hatch Closure

July 31, 2025

ESA Initiates Construction of LISA Mission to Detect Gravitational Waves

0

UK-France MicroCarb Satellite Launches to Enhance Global CO₂ Monitoring

0

NASA’s SpaceX Crew-11 Arrives at Kennedy Space Center for Upcoming Launch

0

UK’s Role in ESA’s General Support Technology Programme: Early Impact Insights

0

Dragon CRS-33 Delivers 3D Printing, Bioprinting, and Reboost Hardware to ISS After Florida Launch

August 24, 2025

SpaceX CRS-33 Launches With 5,000 Pounds of Research, ISS Docking Set for Aug. 25

August 24, 2025

CRS-33: Dragon to Launch 2:45 a.m. EDT, Dock with ISS Aug. 25

August 24, 2025

Inside Orion: Artemis II Systems, Integration, and Mission Readiness

August 22, 2025

Popular Stories

  • NASA and SpaceX Conduct Crew-11 Dry Run Ahead of Launch

    0 shares
    Share 0 Tweet 0
  • SpaceX Dragon Missions: Crew Prepares for Departure and Arrival at ISS

    0 shares
    Share 0 Tweet 0
  • NASA Advances Supersonic Parachute Technology for Mars Missions

    0 shares
    Share 0 Tweet 0
  • SpaceX Crew-11 Prepares for Launch: Final Steps Before Hatch Closure

    0 shares
    Share 0 Tweet 0
  • Upcoming Suborbital Rocket Launches from NASA Wallops: July 28-August 8, 2025

    0 shares
    Share 0 Tweet 0
  • About
  • Advertise
  • Privacy & Policy
  • Contact
The Space Feed

© 2025 Stride Interactive Group

No Result
View All Result
  • Home
  • Launches
  • Space Technology
  • Human Spaceflight
  • Space Exploration
  • Astronomy

© 2025 Stride Interactive Group