The Space Feed | Latest Space News
  • Home
  • News
    • Launches
    • Space Technology
    • Human Spaceflight
    • Space Exploration
    • Astronomy
  • Launch Schedule
    • Upcoming Launches
    • Completed Launches
  • Knowledge Base
    • All Missions
    • All Rockets
No Result
View All Result
  • Home
  • News
    • Launches
    • Space Technology
    • Human Spaceflight
    • Space Exploration
    • Astronomy
  • Launch Schedule
    • Upcoming Launches
    • Completed Launches
  • Knowledge Base
    • All Missions
    • All Rockets
No Result
View All Result
The Space Feed | Latest Space News

Orion Stage Adapter Arrives at KSC for Artemis II Stacking and CubeSat Integration

August 21, 2025
in Human Spaceflight

NASA reports that the Orion Stage Adapter has arrived at Kennedy Space Center to support Artemis II stacking operations and potential CubeSat payload integration. For full details, see the official update on NASA’s site: NASA blog post.

What is the Orion Stage Adapter?

The Orion Stage Adapter (OSA) is the structural element that connects the Space Launch System’s upper stage to the Orion spacecraft. It also provides volume and interfaces that can support secondary payloads such as CubeSats when manifested, while housing separation systems and routing for power and data.

Why this milestone matters

  • The OSA’s arrival marks a key step in the stacking flow for Artemis II, moving the mission from component delivery toward integrated vehicle assembly.
  • Its installation enables final fit checks between the upper stage and Orion, de-risking interfaces ahead of integrated tests.
  • If secondary payloads are included, the OSA is the place where CubeSats are physically accommodated and readied for deployment.

What happens next

  1. Receiving inspection, metrology, and initial functional checks.
  2. Fit checks and mechanical integration with the upper stage hardware.
  3. Installation and verification of separation mechanisms, avionics interfaces, and harnessing.
  4. Preparation and integration flow for any manifested CubeSats, including environmental and interface checks.
  5. Transfer to the Vehicle Assembly Building for stacking with the SLS and Orion.
  6. Integrated verification and systems tests in preparation for rollout and launch operations.

Artemis II context

Artemis II is planned as the first crewed flight of NASA’s Artemis campaign, validating Orion’s life support, navigation, and communication systems in cislunar space. Completing hardware deliveries like the OSA keeps the program on track for full vehicle integration and the subsequent test campaign.

For the most current and authoritative information, refer to NASA’s update: Artemis II hardware delivery at Kennedy.

Previous Post

NASA Schedules September Reveal of 2025 Astronauts and Artemis II Briefings, Eyes April 2026 Launch

Next Post

Joint IMAP, SWFO-L1 and Geocorona Missions Target Sept. 23 Launch to L1

Related Posts

Human Spaceflight

ESA FLY study finds ISS missions feasible with prostheses, moves to certification and training

November 11, 2025
Human Spaceflight

ESA study clears path for prosthesis-wearing astronauts as McFall details certification and training plans

November 11, 2025
Human Spaceflight

New Shepard NS-32 Carries Six on Blue Origin’s 12th Crewed Suborbital Mission, Total Reaches 64 Flown

November 9, 2025
Human Spaceflight

New Shepard NS-32 completes 12th crewed mission as Blue Origin total reaches 64 people flown

November 6, 2025
Human Spaceflight

Blue Origin Flies Six on NS-33, Achieving 13th Crewed New Shepard Mission

November 6, 2025
Human Spaceflight

JAXA outlines fresh food manifest on HTV-X1 resupply mission

October 31, 2025
Next Post

Joint IMAP, SWFO-L1 and Geocorona Missions Target Sept. 23 Launch to L1

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Trending
  • Comments
  • Latest

NASA and SpaceX Conduct Crew-11 Dry Run Ahead of Launch

July 29, 2025

SpaceX Dragon Missions: Crew Prepares for Departure and Arrival at ISS

July 30, 2025

NASA Advances Supersonic Parachute Technology for Mars Missions

July 30, 2025

Upcoming Suborbital Rocket Launches from NASA Wallops: July 28-August 8, 2025

July 28, 2025

Dragonfly Mission Hits Major Test Milestones, Targets 2028 Falcon Heavy Launch

1

ESA Initiates Construction of LISA Mission to Detect Gravitational Waves

0

UK-France MicroCarb Satellite Launches to Enhance Global CO₂ Monitoring

0

NASA’s SpaceX Crew-11 Arrives at Kennedy Space Center for Upcoming Launch

0

ESCAPADE Reset to Nov. 13 After G4 Storm; Blue Origin VADR Launch Preserves Mars Trajectory

November 13, 2025

Brazil, INPE and ESA plan uptake of Biomass P-band radar data for Amazon carbon monitoring

November 13, 2025

LOFAR and XMM-Newton confirm coronal mass ejection from a red dwarf, threatening exoplanet atmospheres

November 12, 2025

DLR’s MAPHEUS-16 Sets Microgravity Payload Record with Twin Red Kite Motors

November 12, 2025

Popular Stories

  • NASA and SpaceX Conduct Crew-11 Dry Run Ahead of Launch

    0 shares
    Share 0 Tweet 0
  • SpaceX Dragon Missions: Crew Prepares for Departure and Arrival at ISS

    0 shares
    Share 0 Tweet 0
  • NASA Advances Supersonic Parachute Technology for Mars Missions

    0 shares
    Share 0 Tweet 0
  • Upcoming Suborbital Rocket Launches from NASA Wallops: July 28-August 8, 2025

    0 shares
    Share 0 Tweet 0
  • SpaceX Crew-11 Prepares for Launch: Final Steps Before Hatch Closure

    0 shares
    Share 0 Tweet 0
  • About
  • Advertise
  • Privacy & Policy
  • Contact
The Space Feed

© 2025 Stride Interactive Group

No Result
View All Result
  • Home
  • News
    • Launches
    • Space Technology
    • Human Spaceflight
    • Space Exploration
    • Astronomy
  • Launch Schedule
    • Upcoming Launches
    • Completed Launches

© 2025 Stride Interactive Group