The Space Feed | Latest Space News
  • Home
  • News
    • Launches
    • Space Technology
    • Human Spaceflight
    • Space Exploration
    • Astronomy
  • Launch Schedule
    • Upcoming Launches
    • Completed Launches
  • Knowledge Base
    • All Missions
    • All Rockets
No Result
View All Result
  • Home
  • News
    • Launches
    • Space Technology
    • Human Spaceflight
    • Space Exploration
    • Astronomy
  • Launch Schedule
    • Upcoming Launches
    • Completed Launches
  • Knowledge Base
    • All Missions
    • All Rockets
No Result
View All Result
The Space Feed | Latest Space News

Orion’s Abort Tower Installed as Artemis II Prepares for VAB Stack

September 19, 2025
in Human Spaceflight

NASA has installed the Launch Abort System (LAS) tower on the Orion spacecraft for Artemis II, marking a major integration step before stacking inside the Vehicle Assembly Building (VAB) at Kennedy Space Center. The tower, approximately 44 feet tall, was mated to Orion inside the Launch Abort System Facility on Sept. 17 as teams prepare the spacecraft for final closeouts and movement to the VAB.

Installation and schedule

With LAS installation complete, technicians will conduct remaining closeout work and functional checks prior to transporting Orion to the VAB for stacking atop the Space Launch System (SLS) rocket. The integrated vehicle will undergo additional testing before rollout to the launch pad ahead of the program’s first crewed mission, currently targeted for 2026.

How the Launch Abort System works

The LAS is designed to rapidly separate the crew module from the launch vehicle in the unlikely event of an emergency during ascent. It integrates three solid rocket motors that operate in a defined sequence:

  1. Abort motor: Provides the initial high-thrust pull to separate Orion’s crew module from the rocket.
  2. Attitude control motor: Steers and orients the capsule to a controlled trajectory away from the vehicle.
  3. Jettison motor: Separates the LAS from the crew module before parachute deployment.

During a nominal ascent, Orion discards the LAS after passing through the most dynamic portion of flight, reducing mass for the remainder of the translunar journey.

Why this milestone matters

  • Completes a critical safety integration for crewed operations on Artemis II.
  • Advances the VAB stacking flow and integrated test campaign for SLS/Orion.
  • Supports certification objectives for human-rating the combined system ahead of a lunar flyby mission.

What’s next

  • Finalize closeout activities and verify LAS and Orion interfaces.
  • Transport Orion to the VAB for stacking on SLS.
  • Conduct integrated testing prior to rollout to the launch pad at Kennedy Space Center.

Source: NASA image article.

Previous Post

DSOC Wraps on Psyche with Record-Distance Laser Link at 218 Million Miles

Next Post

Blue Origin Secures CLPS Deal to Land NASA’s VIPER Rover at Lunar South Pole in 2027

Related Posts

Human Spaceflight

ESA FLY study finds ISS missions feasible with prostheses, moves to certification and training

November 11, 2025
Human Spaceflight

ESA study clears path for prosthesis-wearing astronauts as McFall details certification and training plans

November 11, 2025
Human Spaceflight

New Shepard NS-32 Carries Six on Blue Origin’s 12th Crewed Suborbital Mission, Total Reaches 64 Flown

November 9, 2025
Human Spaceflight

New Shepard NS-32 completes 12th crewed mission as Blue Origin total reaches 64 people flown

November 6, 2025
Human Spaceflight

Blue Origin Flies Six on NS-33, Achieving 13th Crewed New Shepard Mission

November 6, 2025
Human Spaceflight

JAXA outlines fresh food manifest on HTV-X1 resupply mission

October 31, 2025
Next Post

Blue Origin Secures CLPS Deal to Land NASA’s VIPER Rover at Lunar South Pole in 2027

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Trending
  • Comments
  • Latest

NASA and SpaceX Conduct Crew-11 Dry Run Ahead of Launch

July 29, 2025

SpaceX Dragon Missions: Crew Prepares for Departure and Arrival at ISS

July 30, 2025

NASA Advances Supersonic Parachute Technology for Mars Missions

July 30, 2025

Upcoming Suborbital Rocket Launches from NASA Wallops: July 28-August 8, 2025

July 28, 2025

Dragonfly Mission Hits Major Test Milestones, Targets 2028 Falcon Heavy Launch

1

ESA Initiates Construction of LISA Mission to Detect Gravitational Waves

0

UK-France MicroCarb Satellite Launches to Enhance Global CO₂ Monitoring

0

NASA’s SpaceX Crew-11 Arrives at Kennedy Space Center for Upcoming Launch

0

ESCAPADE Reset to Nov. 13 After G4 Storm; Blue Origin VADR Launch Preserves Mars Trajectory

November 13, 2025

Brazil, INPE and ESA plan uptake of Biomass P-band radar data for Amazon carbon monitoring

November 13, 2025

LOFAR and XMM-Newton confirm coronal mass ejection from a red dwarf, threatening exoplanet atmospheres

November 12, 2025

DLR’s MAPHEUS-16 Sets Microgravity Payload Record with Twin Red Kite Motors

November 12, 2025

Popular Stories

  • NASA and SpaceX Conduct Crew-11 Dry Run Ahead of Launch

    0 shares
    Share 0 Tweet 0
  • SpaceX Dragon Missions: Crew Prepares for Departure and Arrival at ISS

    0 shares
    Share 0 Tweet 0
  • NASA Advances Supersonic Parachute Technology for Mars Missions

    0 shares
    Share 0 Tweet 0
  • Upcoming Suborbital Rocket Launches from NASA Wallops: July 28-August 8, 2025

    0 shares
    Share 0 Tweet 0
  • SpaceX Crew-11 Prepares for Launch: Final Steps Before Hatch Closure

    0 shares
    Share 0 Tweet 0
  • About
  • Advertise
  • Privacy & Policy
  • Contact
The Space Feed

© 2025 Stride Interactive Group

No Result
View All Result
  • Home
  • News
    • Launches
    • Space Technology
    • Human Spaceflight
    • Space Exploration
    • Astronomy
  • Launch Schedule
    • Upcoming Launches
    • Completed Launches

© 2025 Stride Interactive Group